id |
2006_358 |
authors |
McMeel, Dermott |
year |
2006 |
title |
Carnival and Construction - Towards a Scaffolding for the Inclusion of ICT in the Construction Process |
doi |
https://doi.org/10.52842/conf.ecaade.2006.358
|
source |
Communicating Space(s) [24th eCAADe Conference Proceedings / ISBN 0-9541183-5-9] Volos (Greece) 6-9 September 2006, pp. 358-363 |
summary |
In this paper we explore the process of construction, we consider the construction site as a mediated collaborative environment in which many specialist crafts and esoteric skills are present and negotiated. Concrete information when pass onto a construction site becomes part of a fluid morphing object, the validity and meaning of information can change—or be lost—depending on where and when it is. We look at current models of construction and actual construction process and we explore the notion of Carnival as a tool to reconcile the concrete and fluid aspects to communication dynamics of mediated group working in general and of construction site practice specifically. |
keywords |
Carnival; ICT; Construction; Mediation |
series |
eCAADe |
email |
|
full text |
file.pdf (364,255 bytes) |
references |
Content-type: text/plain
|
Attali, J. (1985)
Noise: The Political Economy of Music
, Manchester University Press
|
|
|
|
Bakhtin, M. (1984)
Rabelais and his world
, Indiana University Press, Bloomington, IN
|
|
|
|
Cox, S. & Hamilton, A. (1995)
Architect’s Job Book
, RIBA Publications, London
|
|
|
|
Douglas, M. (1978)
Purity and danger: an analysis of concepts of pollution and taboo
, Routledge, London
|
|
|
|
Hyde, L. (1998)
Trickster makes this world: mischief, myth, and art
, Farrar, Straus and Giroux, New York
|
|
|
|
Kagioglou, M., Cooper, R. & Aouad, G. (2001)
Performance management in construction: a conceptual framework
, Construction Management and Economics, 19, pp. 85-95
|
|
|
|
Kagioglou, M., Cooper, R., Aouad, G. & Sexton, M. (2000)
Rethinking construction: the Generic Design and Construction Process Protocol. Engineering
, Construction and Architectural Management, 7, pp. 141-153
|
|
|
|
Lawson, B. (2004)
How designers think : the design process demystified
, How designers think : the design process demystified
|
|
|
|
Li, H., Cao, J., Castro-Lacouture, D. & Skibniewski, M. (2002)
A framework for developing a unified B2B etrading construction marketplace
, Automation in Construction, pp. 201-211
|
|
|
|
Mcmeel, D., Coyne, R. & Lee, J. (2005)
Talking Dirty: Formal and Informal Communication in Construction Projects
, Martens, B. & Brown, A. (Eds.) Book Talking Dirty: Formal and Informal Communication in Construction Projects. Österreichischer Kunst- und Kulturverlag, City, pp. 265-274
|
|
|
|
Peansupap, D. V. & Walker, P. D. H. T. (2005)
Factors Enabling Information and Communication Technology Diffusion and Actual Implementation in Construction Organisations
, ITcon. Place, Published
|
|
|
|
Pedreschi, R. (2000)
Eladio Dieste. The Engineer’s Contribution to Contemporary Architecture
, Thomas Telford Publisher, London
|
|
|
|
Plume, J. & Mitchell, J. (2005)
A Multi-Disciplinary Design Studio using a Shared IFC Building Model
, Martens, B. & Brown, A. (Eds.) Book A Multi-Disciplinary Design Studio using a Shared IFC Building Model. Springer, City, pp. 445-464
|
|
|
|
last changed |
2022/06/07 07:58 |
|