id |
ascaad2006_paper28 |
authors |
Shih, Naai-Jung and Pin-Hung Wang |
year |
2006 |
title |
Visualization Management and Inspection for Plumbing Construction Quality Control |
source |
Computing in Architecture / Re-Thinking the Discourse: The Second International Conference of the Arab Society for Computer Aided Architectural Design (ASCAAD 2006), 25-27 April 2006, Sharjah, United Arab Emirates |
summary |
This research compares the working process at a construction site with the shop drawings made by a plumbing inspector for installed pipes. This study compared the 2D plumbing shop drawings with the 3D point cloud of the toilet in a campus building. A long-range 3D scanner was used to retrieve the point cloud records of pipes to build a visualization management system. The visual comparison was used to locate pipes at the construction site. We found the differences could be identified easily between the point cloud and shop drawings. The presence of point clouds created a new method to inspect plumbing locations, as a way to verify construction quality. |
series |
ASCAAD |
email |
|
full text |
file.pdf (1,279,208 bytes) |
references |
Content-type: text/plain
|
A quantitative study of post contract award design changes in construction (1999)
COX, I. D., MORRIS, J. P., ROGERSON, J. H., and JARED, G. E.
, Construction Management and Economics, 17(4), 427-439
|
|
|
|
Construction delay: a quantitative analysis (2000)
AL-MOMANI, A. H.
, International Journal of Project Management, 18(1), 51-59
|
|
|
|
Information model for managing design changes in a collaborative environment (1998)
MOKHTAR, A., BÉDARD, C., and FAZIO, P.
, Journal of Computing in Civil Engineering, 12(2), 82-92
|
|
|
|
Learning construction processes using virtual reality models (2005)
SAMPAIO, A. Z., HENRIQUES, P. and STUDER, P.
, ITcon Electronic Journal of Information Technology in Construction, v.10, 141-151
|
|
|
|
Mechanical and electrical equipment for buildings (1992)
STEIN B. and REYNOLDS J. S.
, John Wiley & Sons
|
|
|
|
Point-cloud-based comparison between construction schedule and as-nuilt progress: long range three-dimensional laser scanner’s approach (2004)
SHIH, N. J. and WANG, P. H.
, Journal of Architectural Engineering, 98-102
|
|
|
|
Readings in Human-Computer Interaction: Toward the Year 2000 (Second Edition) (2005)
Baecker R. M., Grudin J., William A. S. Buxton & Saul Greenberg
, Los Altos, CA: Morgan-Kaufmann Publishers
|
|
|
|
Semiautomated detection of design errors in 2D drawings using 3D reconstruction (2004)
LI, H., CAO, Y. and LU, M.
, Computer-Aided Civil and Infrastructure Engineering, 19(4), 288-294
|
|
|
|
The Application of Reverse Engineering for Building (Construction ) Management (2002)
SHIH, N. J. and WANG, P. H.
, Proceedings of the 20th Conference on Education in Computer Aided Architectural Design in Europe (eCAADe2002), Warsaw, Poland, 338-341
|
|
|
|
Utilizing virtual environments in construction projects (2003)
SAVIOJA, L., MANTERE, M., OLLI, I., ÄYRÄVÄINEN, S., GRÖHN, M. and ISO-AHO, J.
, ITcon Electronic Journal of Information Technology in Construction, v.8, 85-99
|
|
|
|
last changed |
2007/04/08 19:47 |
|