id |
caadria2018_180 |
authors |
Mekawy, Mohammed and Petzold, Frank |
year |
2018 |
title |
BIM-Based Model Checking in the Early Design Phases of Precast Concrete Structures |
doi |
https://doi.org/10.52842/conf.caadria.2018.2.071
|
source |
T. Fukuda, W. Huang, P. Janssen, K. Crolla, S. Alhadidi (eds.), Learning, Adapting and Prototyping - Proceedings of the 23rd CAADRIA Conference - Volume 2, Tsinghua University, Beijing, China, 17-19 May 2018, pp. 71-80 |
summary |
Designers often carry out their work in the early design stages with disregard to prefabrication requirements, leading to poorly thought out design decisions in terms of precast concrete planning efficiency. If precast expertise could be integrated early into design schemes, this would improve design efficiency, reduce errors and misalignments, and save time at every design iteration. The objective is not to replace precast domain experts, but to help architects make better-informed design decisions. This research is part of a wider investigation that aims to develop a rule-based expert system to support an automated review of precast concrete requirements in BIM models in the early design stages, proactively providing feedback for design decision support. This specific paper summarizes the theoretical part of the research and proposes a way to formalize precast expert knowledge as rule-sets in a tabular form that can be later programmed and integrated in a BIM platform for automated checking of BIM models. |
keywords |
Precast Concrete; Rule-based checking; BIM-based model checking; Expert system; Decision tables |
series |
CAADRIA |
email |
|
full text |
file.pdf (3,922,175 bytes) |
references |
Content-type: text/plain
|
ACI, . (1973)
Decision Logic Table Format for Building Code Requirements for Reinforced Concrete
, American Concrete Institute
|
|
|
|
Adeli, H (1988)
Expert Systems in Construction and Structural Engineering
, CRC Press, London
|
|
|
|
Arditi, D, Ergin, U and Günhan, S (2000)
Factors Affecting the Use of Precast Concrete Systems
, Journal of Architectural Engineering, 6, pp. 79-86
|
|
|
|
Belsky, M, Sacks, R and Brilakis, I (2016)
Semantic Enrichment for Building Information Modeling
, Computer-Aided Civil and Infrastructure Engineering, 31, pp. 261-274
|
|
|
|
BIMForum, . (2016)
Level of Development Specification 2016
, BIMForum
|
|
|
|
Costa, G and Madrazo, L (2015)
Connecting building component catalogues with BIM models using semantic technologies: an application for precast concrete components
, Automation in Construction, 57, pp. 239-248
|
|
|
|
Diez, R, Padrón, VM, Abderrahim, M and Balaguer, C (2007)
AUTMOD3: The integration of design and planning tools for automatic modular construction
, International Journal of Advanced Robotic Systems, 4, pp. 457-468
|
|
|
|
Elliott, K and Jolly, C (2013)
Multi-Storey Precast Concrete Framed Structures
, Wiley-Blackwell
|
|
|
|
Fenves, SJ, Gaylord, EH and Goel, SK (1969)
Decision table formulation of the 1969 AISC specification
, University of Illinois, Urbana, Illinois
|
|
|
|
Fenves, SJ (1966)
Tabular Decision Logic for Structural Design
, Journal of the Structural Division, 92, pp. 473-490
|
|
|
|
Fischer, MA (1993)
Automating constructibility reasoning with a geometrical and topological project model
, Computing Systems in Engineering, 4(2), pp. 179-192
|
|
|
|
Grosan, C and Abraham, A (2011)
Intelligent Systems: A Modern Approach
, Springer
|
|
|
|
Jiang, L and Leicht, RM (2015)
Automated Rule-Based Constructability Checking: Case Study of Formwork
, Journal of Management in Engineering, 31, p. 10
|
|
|
|
Jiang, L, Solnosky, R and Leicht, RM (2013)
Virtual prototyping for constructability review
, 4th Construction Specialty Conference, Montréal, Québec, Canada, p. 11
|
|
|
|
Marzouk, M and Abubakr, A (2016)
Decision support for tower crane selection with building information models and genetic algorithms
, Automation in Construction, 61, pp. 1-15
|
|
|
|
Nawari, NO and Alsaffar, A (2015)
Understanding Computable Building Codes
, Civil Engineering and Architecture, 3(6), pp. 163-171
|
|
|
|
PCI Industry Handbook Committee, . (2010)
Designing with Precast and Prestressed Concrete
, Precast/Prestressed Concrete Institute PCI, Chicago
|
|
|
|
Polat, G (2008)
Factors affecting the use of precast concrete systems in the United States
, Journal of Construction Engineering and Management-Asce, 134, pp. 169-178
|
|
|
|
Pollack, SL, Hicks, HT and Harrison, WJ (1972)
Decision Tables: Theory and Practice
, John Wiley & Sons Inc., New York
|
|
|
|
Retik, A and Warszawski, A (1994)
Automated design of prefabricated building
, Building and Environment, 29(4), pp. 421-436
|
|
|
|
last changed |
2022/06/07 07:58 |
|