id |
cf2005_2_52_159 |
authors |
SHIH Naai-Jung and WU Ming-Chang |
year |
2005 |
title |
A 3D Point-cloud-based Verification of As-built Construction Progress |
source |
Learning from the Past a Foundation for the Future [Special publication of papers presented at the CAAD futures 2005 conference held at the Vienna University of Technology / ISBN 3-85437-276-0], Vienna (Austria) 20-22 June 2005, pp. 193-202 |
summary |
Point clouds were overlapped to reveal differences between two working days. The same type of comparison was made between 2003.2.11 and 2003.12.11. Comparisons between the original schedule and real schedule (the catch-up schedule) were also made. The overlapping test provides one of the most comprehensive checking methods of the as-built progress in a digital format. Examples show that the overlapping comparisons help identify the addition and removal of objects scanned from 50 meters away. The geometric information is feasible for construction inspection and records. Limitations and benefits of overlapping are discussed. |
keywords |
3D scan, construction technology, schedule |
series |
CAAD Futures |
email |
|
full text |
file.pdf (377,296 bytes) |
references |
Content-type: text/plain
|
Al, S., and Salman, T. (1985)
Large-scale construction projects: Management, design and execution
, Batsford: London
|
|
|
|
Atkin, B. (1986)
Computer supported information interchange for construction projects
, International Association for Bridge and Structural Engineering workshop, 55–65. Zuerich
|
|
|
|
Besuner, P., and J. Springfield (1998)
Modeling existing facilities via laser
, Lasers & Optronics 17(5): 43-4
|
|
|
|
Cho, Y.K., C.T. Haas, K. Liapi, and S.V. Sreenivasan (2002)
A framework for rapid local area modeling for construction automation
, Automation in Construction 11(6): 629–641
|
|
|
|
Dawood, N., E. Sriprasert, Z. Mallasi, and B. Hobbs (2003)
Development of an integrated information resource base for 4D/VR construction process simulation
, Automation in Construction 12(2): 123-131
|
|
|
|
Debevec, P.E., C.J. Taylor, J. Malik, G. Levin, G. Borshukov, and Y. Yu (1998)
Image-based modeling and rendering of architecture with interactive photogrammetry and view-dependent texture mapping, ISCAS '98
, Proceedings of the 1998 IEEE International Symposium on Circuits and Systems (Cat. No.98CH36187), vol.5, 514-17
|
|
|
|
Dzeng, R. J., and Wang, W. C. (2003)
Automatic schedule integration for highway projects
, Automation in Construction 12(4): 447–461
|
|
|
|
Hanke, K. and M.A. Ebrahim (1999)
The ‘Digital Projector’ Raytracing as a tool for digital close-range photogrammetry
, ISPRS Journal of Photogrammetry & Remote Sensing 54: 35–40
|
|
|
|
McKinney, K., and M. Fischer (1998)
Generating, evaluating and visualizing construction schedules with CAD tools
, Automation in Construction 7(6): 433–447
|
|
|
|
Shih, N.J., and Wang, P.H. (2004)
Point-cloud-based comparison between construction schedule and as-built progress - a long-range 3D laser scanner’s approach
, Journal of Architectural Engineering 10(3): 98-102
|
|
|
|
Shih, N.J. (2002)
An application of a 3D scanner in the representation of building construction site
, Proceedings, 19th Int. Symp. on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), 337-342. Madrid
|
|
|
|
last changed |
2005/05/05 07:06 |
|