authors |
Weber, Benz |
year |
1991 |
title |
LEARNING FROM THE FULL-SCALE LABORATORY |
source |
Proceedings of the 3rd European Full-Scale Modelling Conference / ISBN 91-7740044-5 / Lund (Sweden) 13-16 September 1990, pp. 12-19 |
summary |
The team from the LEA at Lausanne was not actually involved in the construction of the laboratory itself. During the past five years we have been discovering the qualities and limitations of the lab step by step through the experiments we performed. The method in which we use it is quite different from that of its creators. Since 1985 the external services has been limited to clients coming to the laboratory alone. We help them only with basic instructions for the use of the equipment. Most of these experiments are motivated by the excellent possibilities to discuss the design of a new hospital or home for elderly with the people directly affected by it, such as patients, nurses, doctors and specialists for the technical equipment. The main issues discussed in these meetings are of the dimensions and functional organisation of the spaces. The entire process for a normal room including construction, discussions and dismantling of the full-scale model is between three and five days. Today these types of experiments are occupying the lab only about twenty days a year. |
keywords |
Full-scale Modeling, Model Simulation, Real Environments |
series |
other |
type |
normal paper |
more |
http://info.tuwien.ac.at/efa |
full text |
file.pdf (962,431 bytes) |
references |
Content-type: text/plain
|
last changed |
2004/05/04 15:23 |
|