id |
ecaade2018_284 |
authors |
Hochscheid, Elodie and Halin, Gilles |
year |
2018 |
title |
BIM Implementation in Architecture Firms - Interviews, case studies and action research used to build a method that facilitates implementation of BIM processes and tools |
source |
Kepczynska-Walczak, A, Bialkowski, S (eds.), Computing for a better tomorrow - Proceedings of the 36th eCAADe Conference - Volume 1, Lodz University of Technology, Lodz, Poland, 19-21 September 2018, pp. 231-240 |
doi |
https://doi.org/10.52842/conf.ecaade.2018.1.231
|
summary |
Building Information Modeling/Management (BIM) is an emerging technological and procedural shift within the AEC industry. In this paper, we describe how we used interviews, case studies and action research to collect information on how implementation of BIM is made in architecture firms. Hypotheses on what facilitates BIM implementation in these firms are drawn. |
keywords |
BIM implementation; architecture firms; method; action research; interviews; case studies |
series |
eCAADe |
email |
|
full text |
file.pdf (5,348,906 bytes) |
references |
Content-type: text/plain
|
Arayici, Y, Coates, P, Koskela, L, Kagioglou, M, Usher, C and O'reilly, K (2011)
Technology adoption in the BIM implementation for lean architectural practice
, Automation in Construction, 20(2), pp. 189-195
|
|
|
|
Arayici, Y, Coates, P, Koskela, L, Kagioglou, M, Usher, C and O, K (2011)
BIM adoption and implementation for architectural practices
, Structural survey, 29(1), pp. 7-25
|
|
|
|
Azhar, S, Ahmad, I and Sein, MK (2009)
Action research as a proactive research method for construction engineering and management
, Journal of Construction Engineering and Management, 136(1), pp. 87-98
|
|
|
|
Bataw, A, Burrows, M and Kirkham, R (2014)
The challenges of adopting Building Information Modelling (BIM) principles within Small to Medium sized Enterprises (SMEs)
, Proceedings of the 14th International Conference on Construction Applications of Virtual Reality (CONVR2014), 16-18 November 2014, Sharjah, UAE., pp. 318-324
|
|
|
|
Burgelman, RA (2002)
Strategy as vector and the inertia of coevolutionary lock-in
, Administrative science quarterly, 47(2), pp. 325-357
|
|
|
|
Eastman, CM (2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
, John Wiley & Sons
|
|
|
|
Forgues, D and Lapalme, J (2017)
Research Issues in Attempting to Support an Architecture Firm Transition from Fragmented CAD to BIM Collaborative Design
, Luo, Y (eds), Cooperative Design, Visualization, and Engineering, Springer International Publishing, Cham, pp. 185-192
|
|
|
|
Hochscheid, E and Halin, G (2018)
A model to approach BIM adoption process and possible BIM implementation failures
, Proceedings of the Creative Construction Conference CCC2018, Ljubljana, Slovenia
|
|
|
|
Hochscheid, E, Ribereau-Gayon, M, Halin, G and Hanser, D (2016)
BIM Implementation in SMEs: an Experience of Cooperation between an Architect Agency and a Carpentry Firm.
, Proceedings of the 16th International Conference onComputing in Civil and Building Engineering(343)
|
|
|
|
Hosseini, MR, Namzadi, MO, Rameezdeen, R, Banihashemi, S and Chileshe, N (2016)
Barriers to BIM adoption: Perceptions from Australian small and medium-sized enterprises (SMEs)
, AUBEA 2016: Proceedings of the 40th Australasian Universities Building Education Association Annual Conference
|
|
|
|
Laforet, S (2013)
Organizational innovation outcomes in SMEs: Effects of age, size, and sector.
, Journal of World business, Vol. 48, no. 4, p. 490-502
|
|
|
|
Lines, BC, Sullivan, KT, Smithwick, JB and Mischung, J (2015)
Overcoming resistance to change in engineering and construction: Change management factors for owner organizations
, International Journal of Project Management, 33(5), pp. 1170-1179
|
|
|
|
Machado, M, Underwood, J and Fleming, AJ (2016)
Implementing BIM to streamline a design, manufacture, and fitting workflow: a case study on a fit-out SME in the UK
, International Journal of 3-D Information Modeling, 5(3), pp. 31-46
|
|
|
|
Poirier, E, Staub-French, S and Forgues, D (2015)
Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting SME
, Construction Innovation, 15(1), pp. 42-65
|
|
|
|
Rogers, EM (eds) (2003)
Diffusion of innovations, 4th edition
, Simon and Schuster
|
|
|
|
Smith, P (2014)
BIM Implementation - Global Strategies
, Procedia Engineering, 85, pp. 482-492
|
|
|
|
Succar, B (2009)
Building information modelling maturity matrix
, Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies, IGI Global, p. 65-103
|
|
|
|
Turk, Z (2000)
Construction IT: Definition, framework and research issues
, Faculty of Civil and Geodetic Engineering on the doorstep of the millennium. Faculty of Civil and Geodetic Engineering, Ljubljana, pp. 17-32
|
|
|
|
Winch, G and McDonald, J (1999)
SMEs in an environment of change: computer-based tools to aid learning and change management
, Industrial and Commercial Training, 31(2), pp. 49-56
|
|
|
|
last changed |
2022/06/07 07:50 |
|