id |
ecaade2021_169 |
authors |
Qi, Yue, Zhong, Ruqing, Kaiser, Benjamin, Tahouni, Yasaman, Wagner, Hans-Jakob, Verl, Alexander and Menges, Achim |
year |
2021 |
title |
Augmented Accuracy - A human-machine integrated adaptive fabrication workflow for bamboo construction utilizing computer vision |
doi |
https://doi.org/10.52842/conf.ecaade.2021.1.345
|
source |
Stojakovic, V and Tepavcevic, B (eds.), Towards a new, configurable architecture - Proceedings of the 39th eCAADe Conference - Volume 1, University of Novi Sad, Novi Sad, Serbia, 8-10 September 2021, pp. 345-354 |
summary |
Despite being sustainable, strong and lightweight, naturally grown bamboo poles are currently used in restricted building typologies. This is due to the large tolerances in the built structures, which is caused by the variations in the dimensions and geometry of natural material as well as the manual, uninformed and imprecise assembly methods. In previous work, we introduced an adaptive fabrication method for bamboo structures that can monitor the fabrication process and compensate for deviations between built and designed form. As a proof of concept, the method is suitable for small scale bamboo structures in 2D- or simple 3D configuration. This paper extends the previous method by integrating the adaptation strategies into a cohesive fabrication and assembly workflow for large scale complex bamboo structures. To enable that, a more effective sensor localization method, adaptation algorithm, connection and assembly system, as well as web-based user interface are developed. The effectiveness of the proposed methods is demonstrated through the fabrication of a pavilion scale branching bamboo structure that complies with intended geometric boundary conditions. Even though the material has substantial geometrical variations, the final structure shows small geometric deviations and a successful interface with the prefabricated roof elements. Our work shows how vernacular materials and processes can be digitally augmented in order to reliably produce building structures, hence enabling their usage in modern applications to a larger extent. |
keywords |
Adaptive Digital Fabrication; Construction Uncertainties; Computer Vision; Bamboo Structures; HMI |
series |
eCAADe |
email |
|
full text |
file.pdf (11,835,708 bytes) |
references |
Content-type: text/plain
|
Amtsberg, F and Raspall, F (2018)
Bamboo3
, Proceedings of the 23rd International Conference of the Association for Computer-Aided Architectural Design Research in Asia (CAADRIA), Tsinghua University, Beijing, China, pp. 245-254
|
|
|
|
Churkina, G, Organschi, A, Reyer, CPO, Ruff, A, Vinke, K, Liu, Z, Reck, BK, Graedel, TE and Schellnhuber, HJ (2020)
Buildings as a global carbon sink
, Nature Sustainability, 3, pp. 269-276
|
|
|
|
Garrido-Jurado, S, Munoz-Salinas, R, Madrid-Cuevas, FJ and Medina-Carnicer, R (2016)
Generation of fiducial marker dictionaries using Mixed Integer Linear Programming
, Pattern Recognition, 51, pp. 481-491
|
|
|
|
Jahn, G, Newnham, C, Berg, N and Beanland, M (2018)
Making in Mixed Reality
, Proceedings of the 38th Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA), Mexico City, Mexico, pp. 88-97
|
|
|
|
Kyjanek, O, Bahar, BA, Vasey, L, Wannemacher, B and Menges, A (2019)
Implementation of an augmented reality AR workflow for human-robot collaboration in timber prefabrication
, Proceedings of the 36th International Symposium on Automation and Robotics in Construction (ISARC), Banff, Canada, pp. 1223-1230
|
|
|
|
Mitterberger, D, Dörfler, K, Sandy, T, Salveridou, F, Hutter, M, Gramazio, F and Kohler, M (2020)
Augmented bricklaying - Human-machine interaction for in situ assembly of complex brickwork using object-aware augmented reality
, Construction Robotics, 4, pp. 151-161
|
|
|
|
Munoz-Salinas, R, Marín-Jimenez, MJ, Yeguas-Bolivar, E and Medina-Carnicer, R (2018)
Mapping and localization from planar markers
, Pattern Recognition, 73, pp. 158-171
|
|
|
|
Qi, Y, Zhong, R, Kaiser, B, Nguyen, L, Wagner, HJ, Verl, A and Menges, A (2021)
Working with Uncertainties: An Adaptive Fabrication Workflow for Bamboo Structures
, Proceedings of the 2020 DigitalFUTURES (CDRF 2020), Shanghai, China, pp. 265-279
|
|
|
|
Romero-Ramirez, FJ, Munoz-Salinas, R and Medina-Carnicer, R (2018)
Speeded up detection of squared fiducial markers
, Image and Vision Computing, 76, pp. 38-47
|
|
|
|
Vasey, L and Menges, A (2020)
Potentials of cyber-physical systems in architecture and construction
, Sawhney, A, Riley, M and Irizarry, J (eds), Construction 4.0: An Innovation Platform for the Built Environment, Routledge, pp. 91-112
|
|
|
|
Vasey, L, Grossman, T, Kerrick, H and Nagy, D (2016)
The hive: a human and robot collaborative building process
, ACM SIGGRAPH 2016 Talks, New York, United States, pp. 1-2
|
|
|
|
Virtanen, P, Gommers, R, Oliphant, TE, Haberland, M, Reddy, T, Cournapeau, D, Burovski, E, Peterson, P, Weckesser, W, Bright, J, van der Walt, SJ, Brett, M, Wilson, J, Millman, KJ, Mayorov, N, Nelson, ARJ, Jones, E, Kern, R, Larson, E, Carey, CJ, Polat, I, Feng, Y, Moore, EW, VanderPlas, J, Laxalde, D, Perktold, J, Cimrman, R, Henriksen, I, Quintero, EA, Harris, CR, Archibald, AM, Ribeiro, AH, Pedregosa, F, van Mulbregt, P and SciPy 1.0 Contributors, - (2020)
SciPy 1.0: fundamental algorithms for scientific computing in Python
, Nature Methods, 17, pp. 261-272
|
|
|
|
Wagner, HJ, Alvarez, M, Groenewolt, A and Menges, A (2020)
Towards digital automation flexibility in large-scale timber construction: integrative robotic prefabrication and co-design of the BUGA Wood Pavilion
, Construction Robotics, 4, pp. 187-204
|
|
|
|
Willmann, J, Knauss, M, Bonwetsch, T, Apolinarska, AA, Gramazio, F and Kohler, M (2016)
Robotic timber construction - Expanding additive fabrication to new dimensions
, Automation in Construction, 61, pp. 16-23
|
|
|
|
Yuan, PF, Chai, H, Yan, C and Zhou, J (2016)
Robotic Fabrication of Structural Performance-based Timber Grid- shell in Large-Scale Building Scenario
, Proceedings of the 36th Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA), Ann Arbor, pp. 196-205
|
|
|
|
last changed |
2022/06/07 08:00 |
|