id |
ecaade2022_292 |
authors |
Baudoux, Gaelle, Calixte, Xaviera and Leclercq, Pierre |
year |
2022 |
title |
Transition between Architectural Ideation and BIM - Towards a new method through semantic building modeling |
doi |
https://doi.org/10.52842/conf.ecaade.2022.2.357
|
source |
Pak, B, Wurzer, G and Stouffs, R (eds.), Co-creating the Future: Inclusion in and through Design - Proceedings of the 40th Conference on Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2022) - Volume 2, Ghent, 13-16 September 2022, pp. 357–366 |
summary |
Faced with the challenges of the actors' coordination regarding the increasing building complexity, the new digital collective approaches of advanced design raise the problem of the transition between collaborative ideation (first creative moments of deployment of ideas) and the following phases of digital production (including the formalisation of building specifications in BIM models). In response, we aim to develop a digitally instrumented method for moving from conventional architectural graphic documents to the 3D digital models characteristic of BIM. We propose here a detailed formalisation of the ideation-BIM transition problem and a method for managing building information to improve this transition. |
keywords |
Building Information Modeling, Architectural Ideation, Digital Representation, Media Architecture, Semantic Model |
series |
eCAADe |
email |
|
full text |
file.pdf (1,597,470 bytes) |
references |
Content-type: text/plain
|
Chaitin, G. J. (2006)
Meta maths!: the quest for omega
, Vintage. U. Press
|
|
|
|
Daniotti B., Pavan A., Lupica Spagnolo S., Caffi V., Pasini D., Mirarchi C. (2020)
Collaborative Working in a BIM Environment (BIM Platform)
, BIM-Based Collaborative Building Process Management. Springer TractsCivil Engineering. Springer, Cham. https://doi.org/10.1007/978-3-030-32889-4_4
|
|
|
|
Darses, F. (2009)
Résolution collective des problemes de conception
, Travail humain, pp. 43-59
|
|
|
|
Forgues, E.C. (2017)
Adaptation dun modele de maturité BIM pour les principaux intervenants de la chaîne dapprovisionnement en construction
, Mémoire, Ecole de technologie supérieure de l'université du Québec, Montréal, Canada
|
|
|
|
Goel, V. (1995)
Sketches of Thought
, Cambridge: Bradford MIT Press
|
|
|
|
Hijazi, A., & Omar, H. (2017)
Level of detail specifications, standards and file-format challenges in infrastructure projects for BIM level three
, WIT Transactions on The Built Environment, 169, 143-154
|
|
|
|
Hubers, J. (2009)
Collaborative design in Protospace 3.0
, H. Wamelink, M. Prins, & R. Geraedts, Changing roles; new roles, new challenges. Dlft: TU Delft Faculty of Architecture Real Estate & Housing
|
|
|
|
Jamagne, P. (1991)
Combien Project
, Progress report DTP3. ISOM, a software to design dimensioning and functional organization of inner spaces. Rapport LEMA-ULg
|
|
|
|
Jumches, R., Leclercq, P. & Azar, S. (2004)
A Multi-agent system for the interpretation of architecture sketshes
, SBM (pp. 53-61)
|
|
|
|
Leclercq, P., & Juchmes, R. (2002)
The absent interface in design engineering
, AI EDAM, 16(3), 219-227
|
|
|
|
McCarthy, J. (1960)
Recursive Functions of Symbolic Expressions and their Computation by Machine
, Part I, CACM 3(4):184-195
|
|
|
|
NSCSC, Nova Scotia Construction Sector Council, Industrial Commercial Institutional (2010)
Functional Information Technology Phase 1: Detailed Analysis
, préparé par le Construction Engineering and Management Group de l'Université du Nouveau Brunswick
|
|
|
|
Turner, D. A. (2012)
Some history of functional programming languages
, International Symposium on TrendsFunctional Programming (pp. 1-20). Springer, Berlin, Heidelberg
|
|
|
|
Visser, W. (2006)
The cognitive artifacts of designing
, Mahwha, NJ: Lauwrence Erlbaum Associates
|
|
|
|
last changed |
2024/04/22 07:10 |
|