id |
ecaadesigradi2019_660 |
authors |
Martins, Pedro Filipe, Nunes, Sandra, Fonseca de Campos, Paulo and Sousa, José Pedro |
year |
2019 |
title |
RETHINKING THE PHILIPS PAVILION THROUGH ROBOTIC HOT WIRE CUTTING. - An experimental prototype |
source |
Sousa, JP, Xavier, JP and Castro Henriques, G (eds.), Architecture in the Age of the 4th Industrial Revolution - Proceedings of the 37th eCAADe and 23rd SIGraDi Conference - Volume 3, University of Porto, Porto, Portugal, 11-13 September 2019, pp. 235-244 |
doi |
https://doi.org/10.52842/conf.ecaade.2019.3.235
|
summary |
The Philips Pavilion by Le Corbusier and Jannis Xenaquis was a landmark project in thin shell concrete construction, only made possible by an experimental precasting strategy that deeply defined the architectural character of the hyperbolic paraboloid surfaces of the pavilion. Using this historic precedent this research presents a reinterpretation of the design of the Philips Pavilion, specifically tailored for Robotic Hot Wire Cutting technologies and a layered mold system, combining speed and material optimization towards more sustainable concrete construction processes. By documenting the realization of an experimental prototype at a 1:2 scale, this paper demonstrates the feasibility of the proposed strategy and its value in comparison with existing construction scale digital fabrication technologies for concrete. |
keywords |
Digital Fabrication; Concrete; Robotic Hot Wire Cutting; Philips Pavilion |
series |
eCAADeSIGraDi |
email |
|
full text |
file.pdf (15,276,143 bytes) |
references |
Content-type: text/plain
|
Duyster, HC (1959)
Construction of the Pavilion in Prestressed Concrete
, Philips Technical Review, 20, pp. 27-36
|
|
|
|
Enrique, L and Schwartz, J (2016)
CASTonCAST Shell Structures: Realisation of a 1: 10 Prototype of a post-tensioned shell structure from precast stackable components
, Advances in Architectural Geometry 2016, Zurich, pp. 364-377
|
|
|
|
Mankouche, S and Bard, J (2012)
Morphfaux: Probing the Proto-Synthetic Nature of Plaster Through Robotic Tooling
, Proceedings of the 32nd Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA), San Francisco, pp. 177-186
|
|
|
|
Nijse, R (2008)
Rebuilding Le Corbusier's World Exhibition Pavilion; The Po?me Electronique in Brussels, 1958
, Walraven, J and Stoelhorst, D (eds), Tailor-Made Concrete Structures, Taylor and Francis
|
|
|
|
Pronk, A, Houtman, R and Afink, M (2007)
The Reconstruction of the Philips Pavilion
, Proceedings of the conference Sources of Architectural Form, Kuwait
|
|
|
|
S?ndergaard, A and Feringa, J (2017)
Scaling architectural robotics: construction of the Kirk Kapital headquarters
, Proceedings of Fabricate 2017, pp. 264-271
|
|
|
|
S?ndergaard, A, A (2016)
Robotic hot-blade cutting
, RobArch 2016: Robotic Fabrication in Architecture, Art and Design, Sydney, p. 150-164
|
|
|
|
last changed |
2022/06/07 07:59 |
|