id |
ijac20032203 |
authors |
Elvin, George |
year |
2004 |
title |
Integrating Design and Construction with Wearable Computers |
source |
International Journal of Architectural Computing vol. 2 - no. 2 |
summary |
Wearable computers can help bridge the gap betweendesign and construction. They can integrate thesetraditionally separate cultures by improving the flowof information between them. Using a wearablecomputer, design and construction personnel can nowexchange design information quickly and continuouslybetween the point of work on the construction siteand the remote design office. The improved iterationbetween design and construction and much strongerconnection between design personnel andconstruction site afforded by wearable computers maypoint the way to a new kind of integratedarchitectural process. In this study, the goal was todetermine the value of wearable computers inintegrating design and construction by measuringspecific performance characteristics.The resultsinclude findings on productivity, rework andcommunication quality. They reveal that wearablecomputers can improve communication quality andreduce rework, but may have an initially negativeimpact on productivity. These findings suggest thatwearable computers may play a key role in futurebuilding projects, helping to bridge the current dividebetween design and construction. |
series |
journal |
more |
http://www.multi-science.co.uk/ijac.htm |
full text |
file.pdf (296,307 bytes) |
references |
Content-type: text/plain
|
de la Garza, J., et.al. (1994)
Value of Concurrent Engineering for A/E/C Industry
, Journal of Management in Engineering, May/June 1994, pp. 46-55
|
|
|
|
Fergusson, K.J. (1993)
Impact of Integration on Industrial Facility Quality, Center for Integrated Facility Engineering
, Technical Report 84, Stanford University, Palo Alto, CA, 1993, p.84
|
|
|
|
Hameri, A.-P., Nihtila, J. and Rehn, J. (1999)
Document Viewpoint on One-of-a-kind Delivery Process
, International Journal of Production Research, Vol.37, No.6, 1999, pp. 1319-1336
|
|
|
|
Liu, L.Y. and Lustig, M. (1995)
Digital Hard Hat for Construction Site Documentation
, Proceedings of the Sixth International Conference on Computing in Civil And Building Engineering, Berlin, Germany, July 1995, pp. 1603-1606
|
|
|
|
Mann, S. (1998)
Humanistic Intelligence/Humanistic Computing
, Proceedings of the IEEE, Vol.86, No.11, 1998, pp. 2123-2151
|
|
|
|
Peña-Mora, F. and Li, M. (2001)
Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Projects
, Journal of Construction Engineering and Management, January/February 2001, pp. 1-17
|
|
|
|
Pietroforte, R. (1997)
Communication and Governance in the Building Process
, Construction Management and Economics, No.15, 1997, pp. 71-82
|
|
|
|
Siegel, J., et.al. (1995)
Empirical Study of Collaborative Wearable Computer Systems. Human Factors in Computing Systems
, CHI – Conference Proceedings (2), ACM, New York, 1995, pp. 312-313
|
|
|
|
last changed |
2007/03/04 07:08 |
|