id |
sigradi2016_724 |
authors |
Bomfim, Carlos Alberto Andrade; Lisboa, Bruno Teixeira Wildberger; Matos, Pedro Cesar Correia de |
year |
2016 |
title |
Gest?o de Obras com BIM – Uma nova era para o setor da Construç?o Civil [Construction Management with BIM – A new era for the Construction sector] |
source |
SIGraDi 2016 [Proceedings of the 20th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Argentina, Buenos Aires 9 - 11 November 2016, pp.556-560 |
summary |
The update in the design process associated with a constant search for efficient construction methods, budgets and actual schedules, passes through common terms the planning engineering and constructability, rationalization and integration. This article is based on literature review on the topic and interview with the experience of BIM core of a company in Brazil. BIM involves more than just 3D modeling and is also commonly defined into more dimensions, such as 4D (time), 5D (cost), 6D (the built - operation) and 7D (sustainability). The use of BIM can now be considered a reality that will promote changes to Construction. |
keywords |
Project Management; Construction Management; Digital Modeling; Design Process; Simulation |
series |
SIGRADI |
email |
|
full text |
file.pdf (535,993 bytes) |
references |
Content-type: text/plain
|
(1992)
Application of the new production philosophy to construction
, Stanford: Center for Integrated Facility Engineering, Set./1992. 81p
|
|
|
|
(2011)
Case Study in Integrating Lean, Green, BIM into an Undergraduate Construction Management Scheduling Course
, 47th ASSOCIATED SCHOOL OF CCONSTRUCTION ANNUAL INTERNATIONAL CONFERENCE, 2011, Omaha. Proceedings…Omaha: ASC, 2011
|
|
|
|
(2014)
BIM & the 5D project cost manager
, Procedia-Social and Behavioral Sciences, 2014, 119: 475-484
|
|
|
|
(2015)
Green BIM in Sustainable Infrastructure
, Procedia Manufacturing, 2015, 3: 1654-1659
|
|
|
|
last changed |
2021/03/28 19:58 |
|